Football and rugby

Turf replacement at the Nuevo Los Cármenes stadium

Removal of the worn turf and installation of new turf, so the stadium was ready for the season in three weeks.

Stadium pitch with new, even grass

The project

In 2013 ARPASA began contracting and building projects on a turnkey basis. One of the first was replacing the playing surface at the Nuevo Estadio de Los Cármenes, taking on the installation as well as the direction of the works.

The works ran from 31 August to 21 September: removal of the old surface, ground preparation and laying of the new turf with our own machinery.

Three weeks of work

The stadium pitch with worn turf and bare patches
31 August
A stadium pitch with new, even turf
21 September

Project details

Type of project
Football and rugby
Location
Granada
Year
2013
Duration
Three weeks, from 31 August to 21 September
Area
8,000 m² of turf
Works
  • Removal of the old surface
  • Ground preparation
  • Turfing with our own machinery