In 2013 we built Granada CF’s new training complex from scratch: its four pitches and the goalkeeper training area, 35,000 m² of natural grass.
We carried out the whole project: earthworks and grading, the drainage network, the irrigation network with its pumping station, aggregate layers, levelling and fine grading of the surface, seedbed preparation and seeding. Rainwater and irrigation run-off are collected and piped to a lake.
Before and after


The project, step by step
The earthworks formed the platform for the pitches and the lake basin, lined with a waterproof membrane. On each pitch the gravel drainage layer and the sand layer were spread and laser-levelled to finished level, and the surface was fine-graded to form the seedbed.
After seeding, the sprinkler irrigation brought the grass into service pitch by pitch, with the city and the sierra behind.








The ball-stop netting