Football and rugby

Granada CF’s new training complex

Everything beneath the grass at Granada CF’s training complex: earthworks, drainage, irrigation, pumping, a lake that collects the water and the seeding of its four pitches.

Sprinklers watering a pitch already green, next to one still in bare soil, with Granada in the background

The project

In 2013 we built Granada CF’s new training complex from scratch: its four pitches and the goalkeeper training area, 35,000 m² of natural grass.

We carried out the whole project: earthworks and grading, the drainage network, the irrigation network with its pumping station, aggregate layers, levelling and fine grading of the surface, seedbed preparation and seeding. Rainwater and irrigation run-off are collected and piped to a lake.

Before and after

The site of Granada CF’s training complex before the works, with the sierra behind
Before
Finished pitch at Granada CF’s training complex, with the mountains behind
After

The project, step by step

The earthworks formed the platform for the pitches and the lake basin, lined with a waterproof membrane. On each pitch the gravel drainage layer and the sand layer were spread and laser-levelled to finished level, and the surface was fine-graded to form the seedbed.

After seeding, the sprinkler irrigation brought the grass into service pitch by pitch, with the city and the sierra behind.

Backhoe and dumper on the training complex earthworks
Earthworks and grading
Waterproof liner in the basin of the lake that collects rainwater and irrigation run-off
Lining the lake basin
Gravel layer spread over several pitches, with the machines at work
Gravel drainage layer
Backhoe spreading the sand layer over the gravel
Spreading the sand layer
Tractor laser-levelling the sand layer of a pitch, with the sierra behind
Laser-levelled fine grading
Ground prepared in furrows before seeding
Seedbed
Sunset on site: one pitch already green and the ones next to it still under construction
One pitch already green, the others still under construction
Sprinklers watering a pitch that is already green, next to another still bare, with Granada behind
Sprinkler irrigation in service

The ball-stop netting

We also installed the training complex’s ball-stop netting: 5,600 m² of netting 8 metres high.

Ball-stop netting 8 m high beside a pitch at Granada CF’s training complex
Installing the ball-stop netting

Project details

Type of project
Football and rugby
Location
Granada
Year
2013
Area
35,000 m²
Works
  • Four pitches and a goalkeeper training area
  • Earthworks and levelling
  • Lake collecting rainwater and irrigation run-off
  • Drainage, irrigation and pumping
  • Aggregate layers, ground preparation and seeding
  • Ball-stop netting 8 m high (5,600 m²)