The project
In 2014, ARPASA’s first project outside Spain: we built Watford FC’s training ground at Bell Lane (London) from scratch, with every pitch at its training centre, and also worked on the main pitch at the club’s stadium. A major project in another country, under different regulations.
Until then, the club trained on pitches with no drainage network or automatic irrigation: in summer they dried out and, in heavy rain, they became waterlogged. In one year we built five new pitches, with a goalkeeper training area and a fitness training area.
We solved the main problem the land had: in winter it became waterlogged and flooded. We managed to drain all the rainwater from the area the pitches were to occupy by gravity, with no need for forced pumping to remove it.
How it was done
- Protected drainage. The drainage layer and the drainage trenches are wrapped in geotextile, so the surrounding soil does not clog them and they last longer.
- Sprinkler irrigation across the whole pitch. Instead of the rain guns used there, which cover less ground. As well as watering the silica sand in the months that need it, it helps to soften frosts.
- Rainwater drains away on its own. The first two pitches were built at different levels so that the water drains by gravity, when the plan for the area was to pump it. Without pumping, less energy is used, and the savings went into a thicker drainage layer that removes water faster.
- Precision seeding. From 20 to 24 June 2014, a blend of four perennial ryegrass varieties (Lolium perenne), sown with a precision seeder in two crossing passes.
- More resilience where the wear is heaviest. In the goalkeeper and fitness areas, the growing medium has shredded geotextile mixed in, as in equestrian arenas, so the grass holds up better.
During the works and finished


Step by step
Each pitch began with excavation and removal of soil down to design level. The trencher then opened the drainage network and laid the drain pipe while the dumper brought in the gravel for the drainage trenches; on top went the geotextile strips and the sand layer, fine-graded with a laser-guided levelling box to the design fall.






The main pitch
As well as the training centre, we worked on the pitch at the club’s stadium: the same standard in the base and the grass, this time in full view of the stands.


In Greenkeepers magazine
The magazine Greenkeepers devoted four pages to this project in issue 54, March 2015.